Menu
  • Office counters repainted and coated with plexiglass for easier cleaning.
  • Electrical line tree project nearing completion.
  • New playground equipment installation expected by mid-February
  • New pump-out software reviewed with promising features in development.
  • Electronic timecard system streamlining payroll and employee leave applications.
  • Contacting members on the waitlist for storage lots shortly as well.
  • Board Election:Board Election with electronic nominations and voting.  You will get your nomination forms in the email you gave to the office.
  • New crossover SUVs comprehensive maintenance plan to ensure their longevity.
  • Increased patrols after discovering breakin.
  • Measures to Maintain accountability for vehicle use.
  • Developed a detailed maintenance plan to keep all our vehicles in top condition.
  • Six (6) weeks until the water and electricity system startups.
  • Rearranging the Rec Basement for improved safety and efficiency
  • Repairs in the main office bathroom
  • Filling potholes
  • Installing road signs.
  • Finishing brush removal from tree trimming.
  • Excavation with Spring Mills Electric in Neverglades and Bear Bottom areas to relieve overburdened electrical circuits.
  • Playground preparation for new equipment.
  • Grounds keeping
  • Compactor yard preparation.
  • Preventive maintenance on over 1,700 personal electrical disconnects (which will remain off for safety until the season starts)
  • Temporary roadblocks and limited area access may occur due to ongoing maintenance.




 

Go Back

Comments for this post have been disabled.